Project Location: Bonifay, FL
Project Type: Public Utilities
Client: City of Bonifay, FL
Total Contract: $3M+
Upgrades to existing WWTP facility to 3.5MGD. RTD is the Prime/General Contractor. RTD contract work consists total construction of new cast-in-place reinforced concrete Influent Head works including (2) Rotary Drum Screens, (1) Grit King Grit Removal System, Screenings Compactor/Conveyor, Sluice/Slide Gates, Raven 401 Lining System and Odor Control System, New Influent Pump Station wet well, 60HP triplex submersible pumps, piping and controls and 4MG by-pass system required for installation of new Influent PS, New Effluent Disc Filters, New Sludge Transfer Pump System, New Sludge Dewatering Building, major demolition and renovations, site work, site fills, 3,000LF of water, sewage and process piping, major tie in to existing sanitary sewer lines and potable water piping, process equipment installation, complete new electrical, instrumentation and controls systems.
RTD is self-performing over 60% of all the work including all formwork, concrete work, dewatering systems, excavation & backfills, site work, yard piping, process equipment installation, pumps installation and all process piping.